OUR EXPERIENCE
✓ Resistance in the hillside in the village of Mozg (Elbasan), 1993;1999
✓ Resistance of descents in the villages: Caj, Bushtrice etc (Kukes),1997-1998
✓ Resistance in the hillsides in the villages: Bugjon, Fierze, Poroveetc in the district of Puka, 1995-1996
✓ Resistance of hillside in the villages: Baek, Prisht, Verzhozh,Strafik, Kuc in the district of Skrapar, 1982-1983
✓ Preparation of all civil works documentation for the tender: “High Voltage Direct Current Connection 1000MW + 500kVcc, Italy-Montenegro” Toshiba T&D Main contractor, Genova, Italy.
✓ Supervisor and civil work responsible at “Tirana 2 Electrical Substation 400/220/110 Kv”, for Ansaldo T&D (later Toshiba Europe T&D) J.V. with Carlo Gavazzi Group as main contractor.
✓ Supervisor at “Eolica Erchie” Wind Farm construction 30MW in Erchie (BR), Italy, including the construction of a new electrical substation 150/30 kV. Quantity surveyor for the contractor Toshiba T&D
✓ Supervisor at “Eolica Cancellara” Wind Farm Construction 39.6MW in Cancellara (PZ), Italy, including the erection works for 12 wind turbines generators (Vestas –V112), electrical cable conduct and the construction of two new electrical substation 150/30 kV.